Project experience
Built for real Chicagoland conditions.
Every project has its own access, code, sequencing and finish requirements. These examples show the planning PYZ Construction brings to local remodeling work.
AuroraPermitted basement finishing
A multi-stage basement build coordinated around framing, electrical, insulation and drywall inspections. The scope included new rooms, lighting, flooring, trim and bathroom construction.
ChicagoHigh-rise bathroom coordination
Condominium work requires careful scheduling for building access, water shutoffs, material movement and approved framing systems before tile and finish installation begin.
AddisonCommercial tile installation
Large-floor projects start with surface evaluation and preparation, followed by organized layout, tile installation and grouting designed for an active commercial space.